What to Check Before You Order a Concrete Mix Delivery
Ordering a concrete mix delivery sounds straightforward: you call up a supplier, tell them what you need, and the truck arrives. In practice, a lot can go wrong between the phone call and the pour. The mix can be too wet or too stiff. The load can fall short of what you need, or you might have more than you can place. Worse, the concrete might start setting before you finish working it, leaving you with a half-finished slab and a costly mess.
The difference between a smooth pour and a disaster often comes down to what you check before the truck leaves the plant. A few minutes spent verifying your order can save hours of rework, extra haulage costs, and a great deal of frustration. Here are the key points to run through before you confirm that delivery.
Check the Volume You Actually Need
The most common mistake in ordering concrete is guessing the volume. A cubic metre of concrete sounds like a lot, and it is, but a small error in your dimensions can leave you either short or with a surplus that has no use. For slabs, footings, or any flatwork, the calculation is simple: length times width times depth gives you cubic metres. Double-check every measurement. If your slab is not a perfect rectangle, break it into smaller squares and add them up.
Accurate concrete volume planning is the single most reliable way to avoid waste and shortage. It takes five minutes to measure twice and calculate once. That small effort can prevent the need for a second, smaller delivery that costs disproportionately more per cubic metre. It also stops you from ordering too much and then paying to dispose of the excess.
Allow for Wastage and Compaction
Even with perfect measurements, you will lose some concrete. Some spills off the edge of the formwork. Some gets left in the drum of the truck. Some sinks into the ground if the subgrade is dry. A general allowance of five to ten percent on top of your calculated volume is standard. For deeper footings or uneven ground, lean towards the higher end. This is not a guess; it is a practical adjustment that seasoned contractors always make.

Confirm the Mix Grade Matches Your Job
Concrete strength is specified by its grade, usually a number like C10, C30, or C40. Each grade is designed for a different purpose. A garden path or a light-duty patio might only need C10. A garage floor or a driveway that takes vehicle traffic typically calls for C30. A structural foundation or a heavy industrial slab often requires C40 or higher. Using the wrong grade can lead to cracking, crumbling, or failure under load. Check with your structural engineer or your building control officer if you are unsure. The supplier can advise, but the responsibility for the specification is yours.
Check the Slump Before the Truck Leaves
The slump is a measure of how wet the concrete is. A higher slump means a more fluid mix that is easier to pour but weaker once set. A lower slump is stiffer, stronger, and better for flat slabs where you want a clean finish. Your mix design should specify a target slump. When the truck arrives, ask the driver to do a slump test before you let them discharge the load. If the slump is too high, the concrete will be weaker and more prone to cracking. If it is too low, it will be hard to work and may not flow into every corner of the formwork. Rejecting a load at the gate is far better than accepting a problem that cannot be fixed later.
Plan the Timing and the Pour Sequence
Ready-mix concrete has a finite working life. Once the water is added at the plant, the clock starts ticking. In warm weather, you might have an hour and a half before the mix begins to set. In cold weather, you might have a bit longer. Plan your pour so that you have enough people, tools, and time to place, spread, and finish every cubic metre before it stiffens. If you are pouring a large slab, order the loads so that each fresh batch arrives just before you finish placing the previous one. A gap in the sequence creates a cold joint, a weak line where the two batches meet.
Check Access for the Delivery Truck
A concrete truck is large and heavy. It needs a clear, level route to the pour site. Check for low-hanging branches, narrow gates, soft ground, and sharp turns. If the truck cannot get close enough to the formwork, you will need a pump or a wheelbarrow brigade, which adds time and labour. If the ground is soft, the truck might sink or get stuck. Discuss the access with the supplier beforehand. They may suggest a smaller truck or a different delivery method. It is better to know the limits before the truck is on its way.

Know How You Will Handle the Surplus
Even with accurate concrete volume planning, you might end up with a small amount left over. Decide in advance where you will put it. Some contractors pour an extra garden step or a small paving slab. Others have a designated waste area where the concrete can be dumped and allowed to set before being broken up and disposed of. Do not let the driver wash out the drum onto the ground or into a drain. The wash water is highly alkaline and can damage soil, kill vegetation, and block drainage systems. You are responsible for the disposal of any surplus and any wash water.
Have the Right Tools and People Ready
Concrete does not wait. Before the truck arrives, make sure you have all the tools you need: shovels, rakes, screed boards, floats, a trowel, a bull float for large slabs, and a jointer if you need control joints. If you are placing concrete by wheelbarrow, have a ramp that can handle the weight. If you are using a pump, test it before the truck shows up. Make sure you have enough labour. A pour that goes slowly because people are fetching tools or taking breaks will result in a poor finish and a weak slab. The time to get organised is the day before, not the moment the chute opens.
Review the Delivery Order and Paperwork
When the truck arrives, check the delivery ticket. It should show the mix grade, the volume, the slump, and the time of batching. Confirm that the details match what you ordered. If anything is off, question it before the driver starts discharging. Once the concrete is in your forms, you have accepted it. Disputes after the pour are much harder to resolve. Keep the ticket as a record. It is your proof of what was delivered and when.
Getting a concrete mix delivery right is mostly about preparation. Measure carefully, allow for waste, confirm the mix, check the slump, plan the pour, and sort out access and disposal before the truck arrives. The few minutes you spend on these checks will save you time, money, and stress. The concrete itself does the hard work, but your planning makes sure that work counts.